Irrigation, Lakhimpur

Last Updated on:

Introduction:

The total geographical area of Lakhimpur District of the State of Assam is 2277 Sq Km that is 227700Ha. Out of which the net cultivable area is 94725 Ha. And Gross cultivable area is 171465 Ha. As per 2011 census the district has a population of 1042137 persons with population density of 458 SqKm. The climate of the district is subtropical and humid. The average temperature ranges is from 240c to 320c. The winter season statrs by November and continues till February/March. The air is highly humid through out the year and during rainy season the relative humidity is about 61 percent. The area receives heavy rainfall every year and out of 1085mm of annual normal rainfall 60 to 65% is receiving during June to September from South-West monsoon. The district also receives rainfall during pre-monsoon period from March/April to May in the form of thundershowers and hail storms.

There are 9 Development Blocks in the District and two Divisions under Irrigation Department of Assam are responsible for Creation and Utilization of Irrigation potential in 9 Development Block under 5 LAC of the District. Lakhimpur, Boginadi, Karunabari, Bihpuria and Narayanpur Blocks are fall under the jurisdiction of Lakhimpur Ronganadi Bihpuria Division (Irrigation), North Lakhimpur and Dhakuakhana, Ghilamora, Telahi and Nowboicha are falls under the jurisdiction of Dhakuakhana Naoboicha Division (Irrigation), Dhakuakhana. 80% of the total economy of the district depends on agriculture. As the district often suffers from draught like situation, the importance of Irrigation is the highest priority in the district.

 

Our History:

The District forms a part of vast alluvial plain of Assam with a characteristics fertile land, laid down by the river “The Brahmaputra” and its tributaries. The area covering the district is located between 26048/N and 27042/N latitude and 93042/E and 94020/E longitude. There are two civil Sub-Division namely North Lakhimpur and Dhakuakhana and 9 Community development blocks in the district.

 

The project formulation and implementation team in all the development Blocks of Lakhimpur district barring Boginadi, Lakhimpur, Karunabari, Bihpuria and Narayanpur comprises the Executive Engineer, Lakhimpur Ronganadi Bihpuria Division (Irrigation), North Lakhimpur and his team of Engineers, other four Blocks Dhakuakhana, Ghilamora, Telahi and Nowboicha are executed by Executive Engineer, Dhakuakhana Naoboicha Division (Irrigation), Dhakuakhana. The Superintending Engineer, Lakhimpur Circle (Irrigation), North Lakhimpur is the district administrative head of the department to monitoring the execution and implementation of the projects are given by the Superintending Engineer. The state level the project is monitored directly by the Chief Engineer, (Irrigation) through the monitoring and quality Control Cell of the department. In all technical issues relating to formulation, implementation and monitoring of the project the Chief Engineer is the final authority in the State who is controlled by Secretary to the Govt of Assam Irrigation Department. Besides these, the execution of the project is also monitored in the district level by the District Commissioner Lakhimpur, North Lakhimpur.


 

Our Mandate:

The irrigation Department of Lakhimpur mandate focuses on enhancing agriculture production by providing assured Irrigation water, protecting against famine and utilizing Irrigation potential to improve socioeconomic conditions of farmers. These include implementing various irrigation schemes, increasing irrigation intensity and promoting multiple cropping.

 

  • Increase Agriculture production: Provide timely and adequate Irrigation to cultivate high- yielding crops, contributing to overall economic growth.

  • Ensure Water Security: provide assured irrigation water during all seasons and protect against famine through irrigation schemes.

  • Improve Socioeconomic Condition: Utilize irrigation potential to raise the socioeconomic status of farmers by promoting multiple cropping.

  • Create Irrigation Potential: Implement major, medium and minor irrigation schemes to expand the irrigated area.

  • Increase Irrigation Intensity: Enhance Water utilization and encourage multiple cropping practice.

  • Improve Rural Communication: Utilize inspection paths along canals to improve connectivity.

  • Manage Water Resources: Develop and manage water resources effectively, including surface and ground water.

  • Implementing Irrigation Scheme: the Department plans, design and implements various irrigation scheme including major medium and minor project. Depending upon the availability of source of water only minor irrigation have been implemented in the district till date.

  • Participatory Irrigation Management: Involve farmers in irrigation planning, implementation and maintenance.

  • Water User Association: Encourage the formation and functioning of WUA’s to ensure equitable water distribution.

  • Flood Mitigation: Provide low intensity flood irrigation measures.

 

Key Program and Schemes:

Key irrigation program and schemes in Lakhimpur including Minor Project like Hatilung FIS, Pichala FIS, Poita FIS. Additionally programs like PMKSY (Pradhan Mantri Krishi Sinchayee Yojana), Solar and electrically operated Hybrid Tube Well and Medium Deep Tube Well are also significant.

 

Minor Irrigation Projects:
  • Hatilung FIS: Located in Hatilung, it irrigates areas arears Tamulbari, Junubasti, Rawnapara, Rangchali village of Lakhimpur District. It irrigates almost 200 Hect. area at a time.

  • Pichala FIS: Located in the river Pichala of Narayanpur Block, it irrigates areas of Garubandha, Shankarpur, Shantipur, Madhabpur & Joypur villages of Lakhimpur District. The Net irrigation potential of this scheme is 680 Hect.

  • Poita FIS: Located in Poita river of Karunabari block, it irrigates areas of Kutubpur, Fatehpur, Dharampur etc. villages of District Lakhimpur. The net irrigation potential is 200 Hect.

  • Deep tube well and Medium deep tube wells: Lakhimpur has a significant number of Deep tube well and medium deep tube wells for ground water irrigation with 14 nos Deep tube well and 11 Nos. of Medium Deep tube well installed. Almost 420 Ha. Of areas covered by deep tube well and 110 Ha. Of area its covered by medium deep tube well.


 

  • PMKSY (Pradhan Mantri Krishi Sinchayee Yojana): Aims to enhance water access on farms and expand irrigated areas. 360 nos. of shallow tube well installed in the district under this program and 1440 Hect. area have been benefited through this program.

  • Solar and Electrically Operated Hybrid Tube Well: There are 14 nos of Hybrid tube well points have been installed in the District under SoPD-G. The net irrigation Potential is 56 Hect.

  • NABARD: Provides financial support for irrigation project like MDTW irrigation schemes which was funded by NABARD’s LTIF.

  • At present Dhakuakhana Naoboicha Division has 1 (One) STW scheme (150 Points) under PMKSY-HKKP-GW, 1 (One) Hybrid STW scheme (2 Points) under SOPD-G and 4 (Four) Lift Irrigation schemes, 1 (One) Medium Deep Tube Well scheme under its jurisdiction. Also the construction works for 1 (One) MDTW scheme and 1 (One) STW scheme (5 Points) under SOPD-G are in progress.

 

Achievement:

 The Department has completed the Following schemes in last 4 years :

 

LIST OF FUNCTIONAL SCHEMES SANCTIONED FOR THE YEAR 2020-21

Sl.

No.

Name of scheme/Projects

Programme

LAC

Details of AA with Amount

NIA (in hect.)

Physical Progress

Financial Progress

Remarks

 

1

Gohain Tekela MDTWS (2 Pts.)

 

RIDFXXV

 

Lakhimpur

AA/IRR_2020-21(I)_1342 Dtd. 21-05-2020 Rs. 60.00 L

 

20

 

100%

 

100%

 

Functional

 

2

Tatibahar Mornoiguri MDTWS (1 Pt.)

 

RIDFXXV

 

Bihpuria

AA/IRR_2020-21(I)_1337 Dtd. 21-05-2020 Rs. 30.00 L

 

10

 

100%

 

100%

 

Functional

 

3

No. 3 Nimuri MDTWS (1 Pt.)

 

RIDFXXV

 

Bihpuria

AA/IRR_2020-21(I)_1345 Dtd. 21-05-2020 Rs. 30.00 L

 

10

 

100%

 

100%

 

Functional

 

4

 

Jakharia MDTWS (1 Pt.)

 

RIDFXXV

 

Bihpuria

AA/IRR_2020-21(I)_1349 Dtd. 21-05-2020 Rs. 30.00 L

 

10

 

100%

 

100%

 

Functional

 

5

 

Bodoti Lagasu MDTWS

 

RIDFXXV

 

Bihpuria

AA/IRR_2020-21(I)_1348 Dtd. 21-05-2020 Rs. 30.00 L

 

10

 

100%

 

100%

 

Functional

 

6

Installation of 120 Nos. Tube Well underPMKSY- HKKP (Ph-II) at

Lakhimpur LAC

 

PMKSY-HKKP (Ph-II)

 

Lakhimpur

AA/IRR_2020-21(I)_1457 Dtd. 11-08-2020 Rs.

712.15900 L

 

480

 

100%

 

100%

 

Functional

 

7

Installation of 90 Nos. Tube Well under PMKSY- HKKP (Ph-II) at

Nowboicha LAC

 

PMKSY-HKKP (Ph-II)

 

Nowboicha

AA/IRR_2020-21(I)_1453 Dtd. 11-08-2020 Rs.

534.20300 L

 

360

 

100%

 

100%

 

Functional

 

8

Installation of 150 Nos. Tube Well underPMKSY- HKKP (Ph-II) at Bihpuria LAC

 

PMKSY-HKKP (Ph-II)

 

Bihpuria

AA/IRR_2020-21(I)_1586 Dtd. 24-08-2020

Rs. 890.28256 L

 

600

 

100%

 

100%

 

Functional


 

LIST OF FUNCTIONAL SCHEMES SANCTIONED FOR THE YEAR 2022-23

 

 

 

Sl No

 

 

Name of Scheme

 

 

NAME OF LAC

NAME OF BLOCK

Financial aspect (Rs. in lakhs)

Physical aspect

 

 

REMARKS

Sanctione d amount

(in Rs.)

AA. NO & Date of Sanction

Fund utilised(Rs.

in Lakh)

Physical target NIA

(In hect.)

Physical achievement

 

 

1

Installation of Solar and Electrically operated hybrid TubeWell I/S 10 Points under SOPD-G under

Lakhimpur LAC

 

 

LAKHIMPUR

 

Lakhimp ur & Telahi

 

 

78.08

AA/IRR_2022- 23(I)_3554

Dtd. 06-12-2022

Rs. 78.07840 L

 

 

69.56532

 

 

40

 

 

100%

 

 

Functional

 

 

2

Installation of Solar and Electrically operated hybrid Tube Well I/S 2 Points under SOPD-G underNowboicha

LAC

 

 

NOWBOICHA

 

Nowboic ha

 

 

15.62

AA/IRR_2022- 23(I)_3553

Dtd. 06-12-2022

Rs. 15.61568 L

 

 

12.37490

 

 

8

 

 

100%

 

. Functional

 

 

3

Installation of Solar and Electrically operated hybrid Tube Well I/S 2 Points under SOPD-Gunder Bihpuria

LAC

 

 

BIHPURIA

 

 

Bihpuria

 

 

15.62

AA/IRR_2022- 23(I)_3552

Dtd. 06-12-2022

Rs. 15.61568 L

 

 

15.40918

 

 

8

 

 

100%

 

Functional

.

 

 

4

Dogati MDTW I/S (1 Pt.)Powered by SolarEnergy under RIDF XXVIII (NABARD) for the year

2022-23

 

 

LAKHIMPUR

 

 

Telahi

 

 

30.00

AA/IRR_2022- 23(I)_3836

Dtd. 15-03-2023

Rs. 30.00 L

 

 

26.634

 

 

10

 

 

100%

 

Functional

.

 

 

5

Kakatitup MDTW I/S (1 Pt.) Powered by Solar Energy under RIDFXXVIII (NABARD) for the year

2022-23

 

 

LAKHIMPUR

 

 

Telahi

 

 

30.00

AA/IRR_2022- 23(I)_3837

Dtd. 15-03-2023

Rs. 30.00 L

 

 

26.63135

 

 

10

 

 

100%

 

Functional

 

 

LIST OF FUNCTIONAL SCHEMES SANCTIONED FOR THE YEAR 2023- 2024

 

 

 

 

 

Sl No

 

 

 

 

Name of Scheme

 

 

 

NAME OF LAC

 

 

 

NAME OF BLOCK

Financial aspect (Rs. in lakhs)

Physical aspect

 

 

 

 

REMARKS

 

Sanctio ned amount (in Rs.)

 

 

AA. NO

& Date of Sanction

 

 

Fund utilised(Rs. in Lakh)

 

 

Physical target NIA (In

hect.)

 

 

Physical achievement

 

 

 

 

 

 

 

 

 

 

 

 

 

1

Installation of MDTW  I/S powered by Solar  Energy (3 points) Under RIDF-XXIX

(NABARD) under  Lakhimpur LAC for the year 2023-24

 

 

 

LAKHIMPUR

 

 

Lakhimp ur & Telahi

 

 

 

112.50

AA/IRR_2023-

24(I)_414

7

Dtd. 19-

09-2023

Rs. 112.50 L

 

 

 

99.71371

 

 

 

30

 

 

 

100%

 

 

 

Functional

 

 

 

 

2

 

 

Revival and renovation of Hatilung FIS under SOPD-G for the year 2023-24

 

 

 

LAKHIMPUR

 

 

 

Lakhimpur

 

 

 

 

49.04

AA/IRR- 2023-

24(I)-

4166

Dtd. 04/11/202

3

Rs. 49.042

 

 

 

 

37.08

 

 

 

 

70

 

 

 

 

100%

 

 

 

Functional

.

Future Plan:

The future of the department plans to focus on efficient water management, sustainable practice and smart technologies to address the growing challenges of water scarcity and climate change.

  • Micro Irrigation: Techniques like drip and micro sprinkler irrigation deliver water directly to the root zone, reducing water loss through evaporation and runoff.

  • Smart Irrigation Controller: These systems use sensors and data analysis to optimize irrigation schedules based on real time weather conditions and crop need.

 

To develop the irrigation sector of the district, department has prepared a District Irrigation Plan (DIP) for upcoming 5 years to implement deferent schemes and projects. This includes almost 659 nos. of new schemes/projects with targeted Annual Potential Area (AIA) of 29524 hect.

 

In this current financial year the division proposed 21 nos. of new MDTW points under RIDF-XXXI (NABARD), 1 No. Electrically Operated Lift Irrigation Schemes (ELIS) and 7 nos. new MDTW points under SoPD, 30 nos. of new MDTW points under NEC and 9 nos. of Mobile Lift Irrigation Schemes (LIS) in the district till date.


Contact Details

 

Sl.

No.

Name of Officers

Designation

Contact number

Remarks

1

Lakhi KantaKumbang

Superintending Engineer

8638204051

 

2

Sashidhar Pegu

Executive Engineer (I/C)

9101442994

 

3

Karuna Dutta

Assistant Executive Engineer

9707833774

 

4

Hirojit Doley

Assistant Executive Engineer (TC)

7002113195

 

5

Tridip Patir

Assistant Executive Engineer

8134820409

 

6

Chandan Borah

Assistant Engineer

9954651017

 

7

Amrit Kr. Pait

Assistant Engineer

7002891087

 

8

Rohit Khanikar

Junior Engineer

9101826247

 

9

Rajdeep Borah

Junior Engineer

6003310730

 

10

Rituparna Das

Junior Engineer

9508679289

 

11

Pradyut Gogoi

Junior Engineer

9706977328

 

12

Dhriti Ballabh Rajmohan

Junior Engineer

8876184125

 

13

Bidyut Baruah

Junior Engineer

6002631644

 

14

Khirod Pegu

Junior Engineer

9101396849

 

 

 

 

 

 

**************

Title Size Type
Irrigation Lakhimpur 1.47 MB